Fell Behind Schedule Sadge

Fell behind schedule sadge

Fell Behind Schedule Sadge

Anyways-

More Posts from Lunadragongem and Others

3 years ago

My first fic on AO3! If you need some fluff about 2 smitten fucks going on a date, here ya go!


Tags
6 months ago

ASGKGDSSHK

ASGKGDSSHK

Is this what happens when you drink a monster to study but end up not studying and pumping out an entirely new OC??


Tags
1 year ago

I wake up to see that AO3 was down, is now back up with some safety stuff??? I'm assuming to avoid DDoS attacks, and for some reason the font size is big for me without a way to change it. But at least my babygirl is alive and doing well so I dont mind.


Tags
4 years ago

📂♥️❤

❤❤❤

~~~

Ok so. Drunk Katsucrew.

So obviously there will be a hole in the wall bar somewhere and the adults there are gonna be all "aight ok go ahead but no puking"

Katsuki is the giggly drunk, total light weight.

Kariage is a really heavy weight so normally he doesn't get too drunk. Mainly tipsy. also cuz they are absolute monsters when they're drunk.

Hifue is semi weight and the crybaby type.

Mito is the confused/delirious type. She's kinda heavy weight.

Yasushi is the one who drinks the least but when he does he is the one who orders people around and calls them peasants, confuses others for different people.

Henshuu actually doesnt like drinking. But when she does she is pretty much the same. Just a bit more honest and loopy.

And Seika...oh fuck she's a menace.

She's the scary, angry, ready to kill drunk. The amount of times she's accurately thrown a knife at someone to go right next to their face. Just a millimeter away. SHES AN ABSOLUTE SADIST WHEN DRUNK.

She makes the group play weird games like truth or dare. Spin the bottle, 7 mins in heaven, who's the king. Lots of other crazy stuff. But who's the king is just depressing cuz she gets the king stick everytime.

Kariage wants to die from dealing with these absolute messes. But he lives for seeing giggly katsu who laughs at anything and is just plain adorable.

So yeah. He now Carries around a camera whenever they go drinking. He makes them watch the next day and everyone makes a compilation of the most embarrassing part. (kanji will definitely play them during their weddings)

Thank you for coming to my Ted talk.

Also this was heavily inspired by Fairy Tail OVA 9.

Any fairy tail OVA or episode reminds me of katsucrew.

~~~

Hope you have a nice day and stay safe.

3 years ago

A c!niki sketch I'm working on

A C!niki Sketch I'm Working On

Let's be very honest and say, c!niki is a chad. The truest of girl bosses. Chefs kiss gal.


Tags
3 years ago

The urge to draw Dream in a xiao cosplay rn be like: 📈📈📈

Also unrelated to that, I had an idea in the form of THIS:

The Urge To Draw Dream In A Xiao Cosplay Rn Be Like: 📈📈📈

Still working on the other characters lol

Also please don't attack me for simply wanted to make crossover headcanons. I know there are people out there that either differ in opinions or simply don't like the idea of two different fandoms (especially the toxic sides) to merge. However, I'm simply doing this leisurely, if it upsets you, just move on or something.


Tags
4 years ago

Random thought of the day:

What would the world be like if cats were cannibals?


Tags
1 year ago

I feel like chilumi would genuinely fall asleep listening to asmr together. Do they cuddle and stuff? Occasionally yes. Do they argue about what kind of asmr to listen to for the night? Absolutely. They would genuinely just sleep next to eachother, holding hands, and sleep listening to very soothing asmr. I honestly love that for them.


Tags
Loading...
End of content
No more pages to load
lunadragongem - ☆add a lil spice☆
☆add a lil spice☆

Hi y'all! I'm an optimistic yet also pessimistic girl who is also artsy. I'm a total geek + foodie. I like snakes and pastel colors. I can go from polite to bitch to baby to mother hen. She/her but idc if you use others. That's about it.

445 posts

Explore Tumblr Blog
Search Through Tumblr Tags